PRECISION PRODUCTS
7400 SAN FERNANDO RD. SUN VALLEY, CALIFORNIA 91352
ABOUT US CONTACT US ORDERING FREE CATALOG
Copyright J.F.K. Co. Precision Products 2008 - 2009

HAND LEVER COLLET CLOSER

PARTS LIST

201-A Adapter Collet 2-1/2"
201-B Adapter Collet 3"
201-K Key
202-A Ring, Nose L1
202-B Ring, Nose L0
202-C Ring, Nose L00
202-D Ring, Nose Threaded
202-E Ring, Nose L2
203 Tube, Draw
204 Hub Adapter
205  
Actuator Assembly    
  2701 Collar  
  2702 Screw  
  2703 Nut  
  2704 Bearing  
  2705 Cam  
  2706 Collar (Knurled)  
    2753 Finger
    2754 Pin, Pivot
    2707 Pin, Index
    2708 Knob
    2709 Screw
    2710 Spring
PRODUCTION COLLET CLOSERS
206
Handle Casting
207
Nut
208
Screw
209
Nut
210
Rod, Handle
211
Handle
212
Screw
213
Ring, Index
214
Screw
215
Bracket
216
Pin
217
Connector, Rod
218
Rod

219

82 degree Head Allen

To install HAND LEVER CLOSER

  1. Mount hub (204) on back end of spindle. Hubs for plain spindles should be pressed on completely so that the end of the spindle will seat against the bottom of the bore in the hub. Lock with the two set screws (214). Threaded hubs should be screwed onto the spindle so that the end will abut the collar or locknut on the spindle. In some cases it may be necessary to remove the thrust collar or locknut on the spindle to allow complete adaption of the hub.
  2. Mount the index ring (213) on the hub (204) by means of the three screws (212). It is very important that the periphery of the ring is concentric with the axis of the spindle. It is suggested that the mounting screws be loostened slightly and the ring positioned accurately with an indicator. After determining that is it running true the screws should be tightened securely.
  3. Where applicable install nose ring (202) to spindle nose.
  4. Check the taper in the front of the lathe spindle to ascertain the there are no nicks of bumps on the surface. By the use of an indicator determine that the spindle turns without runout in the taper.
  5. Install the closer unit thru the back end of the spindle, slipping the actuator collar (2706) over the index ring (213). Pull out the index pin (2708) and turn so that the set screw (2709) is resting on the edge of the collar (2706).
  6. Mount bracket (215) on case of lathe in such a position that the linkage will be at the same elevation as the spindle. Connect linkage to closer unit.
  7. Insert collet adapter (201) in nose of spindle.
  8. Insert desired collet into adapter and turn collar (2706) so that draw tube (203) will engage collet. Insert piece of material of the required size into the coller and with the unit in the released position turn the collar (2706) until the material is lightly held. Move the hand lever back and forth until the desired tension is obtained by turning the collar. Release the index pin (2708) allowing it to enter the closet hole in the index plate (213). The collar may require turning slightly to allow the index pin to seat completely. CAUTION: Avoid excessive tension on collet.
  9. Adjust linkage so that the operating handle will travel angularly equal from open to middle position and closed to middle position.
201A Collet adapter 1.500 to 1.750 gage line $140.00
201B Collet adapter 1.751 to 2.100 gage line $160.00
201C Collet adapter 2.101 to 2.700 gage line $180.00
201E Collet adapter 2.701 to 3.200 gage line $210.00
201D Collet adapter 3.201 to 3.600 gage line $260.00
201K Key $5.00
202A Nose ring L-1 (6" O.D. - 4-1/8" I.D.) Aluminum $120.00
202B Nose ring L/0 (4-1/2" O.D. - 3-1/4" I.D.) Aluminum $85.00
202C Nose ring L/00 (4" O.D. - 2-3/4" I.D.) Aluminum $75.00
202D Nose ring threaded 2-1/4" - 8 Steel $85.00
202E Nose ring L-2 (8" O.D. - 5-1/4" I.D.) Aluminum $165.00
203 Tube 1.342 - 1.344 O.D. $85.00
Tube over 28" to 38" $120.00
204A Hub 2-1/2" (for pricing only, need lathe dimensions, $35 extra for threaded hubs) $120.00
204B Hub 3" ....................................................".................................................... $130.00
204C Hub 3-1/2" .............................................."................................................... $140.00
204D Hub 4" ....................................................".................................................... $150.00
204F Hub 4-1/2" .............................................".................................................... $160.00
205 Actuator Assembly $325.00
- 2701 Collar $15.00
- 2702 Screw (for 2701 collar) $1.00ea (2)
- 2703 Nut (for 2705 cam) $12.00
- 2704 Bearing and retainer $85.00
- 2705 Cam $74.00
- 2706 Collar (knurled) $39.00
Index Pin Assembly $15.00 2707 Index pin $5.00
2708 Knob $8.50
2709 Screw (for 2708 knob) $1.00
2710 Spring $2.50
- 2753 Finger $10.00ea (3)
- 2754 Pivot pin $2.00ea (3)
220 Tube and finger ring with knurled ring - fingers and pivot pins (easy to exchange) $245.00
206 Handle casting $48.00
207 Nut (handle casing) $1.00ea (2)
208 Screw (handle casing) $3.00ea (2)
209 Nut $1.00ea
210 Handle rod $15.00
211 Handle $9.95
212 Screw (index ring 213 to hub) $1.00ea (3)
213 Index ring $75.00
214 Screw $1.00ea (2)
215 Bracket $28.00
216 Bolt and nut $3.00
217 Connector casting $28.00
218 Threaded rod $7.00
219 10-32 - 1/2... 82 degree flat head allen $1.00ea (3)
CLICK ON IMAGE FOR LARGER VIEW
ABOUT US CONTACT US ORDERING FREE CATALOG
HOME
1-818-767-6707
Fax 1-818-767-1637
info@jfkprecisionproducts.com